The design and construction process of a new mold varies according to the type of mold: injection, thermoforming, blowing, etc.
Also, depending on the size and design of the part, manufacturing can take anywhere from 4 to 30 weeks.
We share the development of an injection mold in PEHD material, for internal engine parts, showing the different phases of the process.